One contradition of VaR

Sometimes I am thinking about VaR calculation and always trying to protect what I am working on. But I have to admit I feel there exists certain big drawbacks of VaR. One thing I feel kind of difficult to give the way to VaR.

VaR(A+B) > VaR(A) + VaR(B)

As a portfolio, composed by A and B investment, should be more diversed than the single investment itself. This is easy to understand, but VaR computation does not give us this theory.

Let us assume, risk of A is 1 million and the chance is 4%. And the same is to B. Well, the VaR’s cut off is set to 5% (means 95% confidence level), so VaR(A) and VaR(B) both are zero. Then let us see A+B. The chance is 1 - (1-4%)(1-4%) = 7.84%, so the VaR(A+B) is 2 million. Well, VaR(A+B) >> VaR(A) + VaR(B).

Subset of VaR’s summerization won’t be maintained. So when we do the portfolio VaR computation, we have to be very careful on this. A supplementary stress test will be quite necessary. And the case always happened as the extreme time and easy to be ignored since it is rare.

Rating: 10.0/10 (1 vote cast)

Related posts:

  1. Microsoft Is in Talks To Buy Facebook Stake SAN FRANCISCO -- Microsoft Corp. is in talks with Facebook...
  2. Risk Management at Lehman After today's turmoil at wall street, shall we calm down...
  3. The Two Million Minutes Blog The Two Million Minutes Blog A continuation of the...

Leave a Reply

Preview:

Tags:
Separate individual tags by commas